Projects Executed...
Our excellent work services have attracted several large and medium-scale projects in about 8 regions of Ghana. The following provides a list of notable successful projects we have undertaken over the span of 8 years;
- May 2021 – Constructed 140m3 biogas system for Ghana Police Training School in Kumasi where compressed biogas is used for cooking.
- March 2021- Consortium Member, Hafepat Ghana Ltd. Construction of Biological Wastewater Treatment System at Tetrem RAP, Asanko Mine, Tetrem, Ashanti Region, Ghana. DAS Biogas led the execution of 4114m3 centralized wastewater treatment systems.
- May 2020 completed 750m3 on-site anaerobic waste water treatment plant at AngloGold Mine Tarkwa (Taberebe) for aquaculture project
- February 2020 Constructed 30m3 biogas plant for Pure and Just Companay where biogas is used for drying fruits.
- February – May 2019 on-site treatment system for public toilet at Adum, Kumasi owned by EOA Group Ghana Limited
- January – April 2019 constructed on-site wastewater treatment system for Abene community where treated water is recycled for flushing
- June – September 2018 constructed on-site wastewater treatment system at Abetifi where treated recycled water is for flushing.
- January 2017 – January 2019 Constructed a 400m3 biogas plant with accessories for Asokore Mampong Affordable Housing Project (DAS Biogas was subcontracted by Nepbio Engineering)